It does not receive public funding
Editor in chief:
CLARA MOSCHINI

Facebook Twitter Youtube Instagram LinkedIn


Do you want to access to this and other private contents?
Log in if you are a subscriber or click here to request service

Ariane 5, rollout to the Final Assembly Building for 19 May's mission carried out

Cayenne, French Guyana - Which will bring to orbit ST-2 and GSAT-8 satellites

It was carried out yesterday the rollout of Ariane 5 from Launcher Integration Building to Final Assembly Building at Kourous spaceport in French Guyana. It was unveiled by Arianespace, which specified that the structures are located at about 650 meters far one from each other and linked by a rail track of 1,600 meter diameter. Rollout brings to its final phase the preparation to VA202 flight, the...

AVIONEWS - World Aeronautical Press Agency - 1129116

AVIONEWS - World Aeronautical Press Agency
Similar